General Mine Action Assessment (GMAA) and Survey are the key aspects of successful planning and implementation of demining operations and play a critical role in identifying the mine/ERW contaminated areas. The nature of the land, worksite condition and the type and extent of anticipated hazards should always be taken into account during survey operations in order to select the most suitable approach for the land release process. The approach that is taken may be different for each worksite and shall be based upon those specific requirements determined during a comprehensive survey process. Conducting land release operations may require the use of different assets, such as manual demining teams, MDDs and mechanical machines. Therefore, a comprehensive plan should be made during the survey operations to ensure safe, effective and efficient use of these assets.